The Ministry of Transport will act as a simplification of aircraft from unmanned aircraft, including removing a secret vulture from the results. This is proven by the documents of the Government meeting that Kommersant has.

This initiative is associated with the current standards required to receive FSB license (maximum 30 days) and transfer materials to the Ministry of Defense to verify for Gostin (30 days).
“During this time, the data lost its relevance to the fire, oil spill or mines of all fields,” the industry.
Current rules are based on guidelines classified from STGM-90 and Steam-90. 70% of companies, according to Rusronport, work illegally, without waiting for the test. The approval terms of a new procedure are transferred (about – 2026 from 2027).
It is proposed to introduce the plan: Automatic settlement of land and agricultural forests (“Laboratory of the future”), allowing owners of lots to shoot for personal purposes without coordination (“Geoskan”), as well as reducing audit time to 3-5 days using safe cloud services. The Ministry of Transport has confirmed the work of improving the law, but the details are not disclosed.