In the center of the capital, the asphalt coating on Tverskaya and 1st Tverskaya-Yamskaya is updated. Place asphalt seamlessly. During work, traffic in the repair area is blocked.

The works located on the website of Tverskaya Street from the Nastasinsky lane to the winning square and transparent Tterskaya-Yamskaya. The number of experts and equipment unit is especially necessary.
On Saturday night, they made milling on the old road surface. On Saturday, they started the device of the new. It is set for seven layers of asphalt and 24 parallel sliding yards, and across the bicycle width, Peter Biryukov, deputy mayor of Moscow.
The work is on the clock. He added that replacing this sugar volume without using seamless design technology will take more than a week.
According to experts in the “sugar” GBU, when placing the upper layer of the asphalt, they use the polymer-bitumen bond mixture. They are designed specifically for the climate of Central Russia. They are used on central streets, highways and flights, including Tverskaya. The basis of such mixture is the crushed stone Gabbro -Diabase. This is a volcanic rock, close to granite by the mineral composition, it is exploited in Karelia. This mixture increases the wear and tear resistance of the sugar.
By the way, the work will complete up to 5.00 on August 18. For pedestrians, moving along the sidewalk does not coincide.